Prevent Limescale Build Up in Student Apartment Units
The Problem: to prevent limescale build up within the 800 plus student apartment units. The Solution: ElectroMag limescale protection. The contractor / developer made significant cost savings Posted by Calmag LtdInstalling an ICE VALVE to Keep your Boiler Working
An ice valve drain installed underneath this customers boiler stopped the boiler from breaking down because of ice build up in the condensate pipe during freezing weather. Posted by Ice ValveFix Boiler Breakdown by Installing an ICE VALVE
An ice valve drain installed underneath this customers boiler stopped the boiler from breaking down because of ice build up in the condensate pipe during freezing weather. Posted by Ice ValveWhat to Expect on a Solar Heating Installation
What to Expect on a Solar Heating Installation by The Solar Installers Ltd "The Solar heater is now up and running and I’m absolutely delighted". Posted by The Solar Installers LtdPre-planning Design Advice to Achieve CSH Level 6
The "Energy in the Code” Pre-planning Design feasibility study gives advice on appropriate LZC technologies to ensure compliance to CSH Level 6 for Ene 1—Dwelling Emission Rate. Posted by National Energy FoundationWarm Front Grant for Solar Thermal Heating Systems
The Warm Front pilot was designed to determine whether integrated solar thermal heating systems would be suitable as a standard measure under the Warm Front grant. Posted by Carillion Energy Services
< Previous
1
Next >

