Wholebuild is proudly working with:
YBS Insulation
Case-study

Design and Build ICF House to CSH Code Level 4 Case Study

Posted by: Logix UK Ltd

Aims:

To design and build a Code level 4 house that doesn’t reply on expensive renewable technology, within a cost build budget of £70k, (based on 20 units)

Performance:

Code level: 4
Space heating: 12.5kwh/m2/yr
ACH: 3.8m3/m2/hr
EPC: A + B

Technologies:

Logix ICF ground floor walls, Sips Roof, Passive Solar design, Ground to air passive heat exchange, Solar thermal water heating, Biomass top up heating

Page Views: 1346
Information Updated on: 20 October 2011