Wholebuild is proudly working with:
Ecochoice
Case-study

Grass Reinforcement Mesh for Grassed Over Car Park Case Study

Posted by: Boddingtons Ltd

Client: Southend Borough Council

Location: East Beach, Shoeburyness

Product: GrassProtecta® (Heavy)

Application: Grassed overflow car park

Size: 2400m²

The Problem:

The East Beach car park offers year-round parking for all visitors to East Beach itself and the associated amenities in Shoeburyness, Essex.The grassed overflow car park historically suffered with the problem of vehicles wearing away the grass and creating ruts, with the area becoming uneven, unsightly and generally muddy and unpleasant in both wet and dry conditions.

The Council required remedial action that would eliminate the existing problems, maintain a natural grassed finish and would be deemed as sympathetic to the natural coastal surroundings, visitors and local residence.

The Solution:

GrassProtecta® (Heavy) was specified, as it met all the remedial requirements. Ruts were levelled with soil and then seeded, with the GrassProtecta® then being pinned to the surface with the supplied fixings. Additional gentrification work was also carried out on the site, creating a new and pleasant parking facility for the public to use.

Click on the Microsite at the bottom of this Case study to find out more about GrassProtecta® (Heavy)

Page Views: 962
Information Updated on: 20 October 2011